staple-logo
  • Номе
  • About us
  • Equipment
  • Products
  • News
  • Contacts
  • Language: English
    • Български Български
    • English English
    • Deutsch Deutsch
  • Номе
  • About us
  • Equipment
  • Products
  • News
  • Contacts
  • Language: English
    • Български Български
    • English English
    • Deutsch Deutsch

Assembly of units

Posted on Saturday February 20th, 2016Tuesday July 19th, 2016 by Full Engineering Ltd.
г4
  1. Getting acquainted with the work documentation.
  2. Installation activities – mechanics, pneumatics and electrical circuits.
  3. Settings and adjustments to the assembly units.
  4. Packaging.

sglobka1 sglobka2

sglobka3 sglobka4

Posted in Work process

Post navigation

← Measurement laboratory
Outgoing control of the finished parts →

Work process

  • Creation of work documentation
  • Manufacturing of parts
  • Outgoing control of the finished parts
  • Assembly of units

Output control

pioneer
fris3
fris2
fris3

Full Engineering Ltd.
Plovdiv, BULGARIA
v. Brani Pole, “Chiririte” 20E
Mobile: +359 889 326 083
Phone: +359 32 335 098
Fax: +359 882 393 777
mail

Copyright © 2025 Full Engineering Ltd. | Design and Development: Go Media Ltd
top