staple-logo
  • Номе
  • About us
  • Equipment
  • Products
  • News
  • Contacts
  • Language: English
    • Български Български
    • English English
    • Deutsch Deutsch
  • Номе
  • About us
  • Equipment
  • Products
  • News
  • Contacts
  • Language: English
    • Български Български
    • English English
    • Deutsch Deutsch

Outgoing control of the finished parts

Posted on Saturday February 20th, 2016Tuesday July 19th, 2016 by Full Engineering Ltd.
г2
  1. Measurment of the sizes with the measurement machine.
  2. Measurment of the surface.
  3. Measurment of surface coatings.
  4. Grading of details.

izmerwane1 izmerwane2

izmerwane3 zamerwane

Posted in Work process

Post navigation

← Assembly of units
Manufacturing of parts →

Work process

  • Creation of work documentation
  • Manufacturing of parts
  • Outgoing control of the finished parts
  • Assembly of units

Output control

pioneer
fris3
fris2
fris3

Full Engineering Ltd.
Plovdiv, BULGARIA
v. Brani Pole, “Chiririte” 20E
Mobile: +359 889 326 083
Phone: +359 32 335 098
Fax: +359 882 393 777
mail

Copyright © 2025 Full Engineering Ltd. | Design and Development: Go Media Ltd
top